Terms and Conditions
In signing up for EnWin Utilities Peaksaver Program you are agreeing to the following terms and conditions:
- I choose to participate in ENWIN's "PeaksaverTM" program being offered pursuant to, and in accordance with, the Ontario Power Authority's (OPA) PeaksaverTM program
- I will permit the Load Control Device installed at my premises to operate until a date not earlier than December 31, 2010
- I will take the reasonable steps necessary to ensure the Load Control Device is not moved, removed or damaged, and continues to operate as intended
- I acknowledge that the OPA or a person designated by the OPA shall have the right to control or dispatch the load control device
- I agree that no Person except the OPA or a Person designated by the OPA shall have the right to control or dispatch the Load Control Device
- I will provide reasonable rights of access to the premises for the purpose of inspection and maintenance of the Load Control Device
- I acknowledge that the appliance on which the Load Control Device is installed is in good working order
- I own, or I am a joint owner of the above named residence. If I am a tenant, I have supplied written approval from the owner of the residence to install the energy management equipment
- The above named residence has central air-conditioning
- In signing this waiver I agree that the private information it contains may be supplied to the OPA and the Dispatch Administrator
If you have any questions regarding these Terms and Conditions, or are interested in signing up for the Peaksaver program - please call our Conservation hotline at 519-255-2727 x6

